Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

淮安市博隆防水

JS复合防水涂料/K11防水涂料/彩色丙烯酸防水涂料/单组份聚氨酯防水涂料/非焦油聚氨...

sell
  • There is no classification
contact
  • Contact:赵里
  • Phone:0517-8505872
search
 
link
  • There is no link yet
home > sell > J-151 high elastic waterproof slurry
J-151 high elastic waterproof slurry
products: Views:5J-151 high elastic waterproof slurry 
brand: 博隆
price: 8500.00元/吨
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-01-27 17:31
 
Details
Introduction to Bolong Quick Leak Plugging King Leak Plugging King
Leak Plugging King refers to a high-performance latest high-tech product that integrates inorganic, alkali-free, waterproof, moisture-proof, crack-proof and anti-seepage plugging. Its most amazing features
are It solidifies quickly and its density and strength are much higher than the current high-grade concrete! It starts to solidify one minute after mixing, and finally solidifies in three to four minutes. The compressive strength can reach the above in one day and can be constructed directly on wet base surfaces. For emergency road restoration, etc., it can be restored to its original state in one hour, and can be opened to traffic in four hours. Used for waterproofing projects, with water and pressure, it can stop leaks immediately. The product is simple to operate, just add water to mix and it can be used. It is non-toxic, harmless and pollution-free. Added silicon The salt acid cement adjusts the retarding time to the same life span of the building.
Scope of application
Non-scalable concrete or mortar structures such as kitchens, bathrooms, basement roofs, etc. It can strengthen the waterproofing of the arcs of internal corners and around pipes, as well as various wall pipes and casing surroundings. It has excellent results in repairing defects and internal corners. It can also be used to bury hooks, seal equipment railings, etc.
Main features
This product has the function of quickly plugging water with water. The initial setting time is only two minutes and the final setting time is 15 minutes.
This product can be applied on both sides of the water surface, and is combined with the base layer to form a non-aging whole, with extremely strong water resistance.
The solidification time of this product can be adjusted arbitrarily according to user needs. The waterproof bonding is completed in one go and the bonding force is strong.
This product has no corrosion to steel bars.
This product is non-toxic, odorless, environmentally friendly and non-flammable, and can be used in drinking water projects.
Trial scope
Roofing concrete flat-sloping roofs, gutters, rain sheds and various irregular-shaped roofs
Underground buildings concrete interior walls and exterior walls ground elevator pits underground tunnels cable wells pipes exterior waterproofing
/> Ground building, bathroom, kitchen, roof, garden, reservoir
Joints, expansion joints, construction joints, settlement joints, through-wall pipes, downspouts.
Five Usage Methods
Base layer requirements: The base layer must be clean, free of sand, loose, and hollow. The moisture content of the base layer should be within the range. The moisture content of the waterproof base layer of ground and underground buildings must be within the range before construction can be carried out. Ventilation holes should be provided at a distance of one per square meter.
The amount of material generally requires grams per square meter, and the thickness is meters. The scraping should be uniform in batches, and the up and down scraping directions should be crosswise. The interval between each time depends on the construction environment and the degree of curing of the coating film. It is generally not less than an hour and is subject to a non-stick feel. According to the design requirements, one or more layers can also be applied.
Coating film protection In order to extend the service life of the waterproof layer and ensure the quality of the project, it is recommended to make a protective layer after the coating construction is completed. Shangren Roofing makes a protective layer of cement mortar on top of the coating film.
Six Precautions
Before the coating film is cured, it is not allowed to be exposed to rain, and no one is allowed to walk or perform other operations
During construction, it is strictly prohibited to come into contact with open flames and water
The shelf life is months at room temperature. .
Request for quotation
A total of0articles  Related Comments: